1, The water heater
Before installing construction, first determine the position of the machine installation, the pipeline route, and then ask the user to confirm the construction. Because of the installation location, the pipeline route does not meet the requirements or reasonable user requirements, the need to rework the material and labor costs, borne by the installer; food forbidden installed in a closed room, must be installed in a well-ventilated and volume is greater than 7.5m3 room, because when the water heater consumes a lot of oxygen, so the room should design area 0.06m2 above inlet and exhaust fans (note: exhaust fans and air intake must be connected with the outside of the room), and certain to install the exhaust pipe;

Place to install the water heater from the surrounding walls and ceiling above 50cm, to stay away from stoves, flammable and hazardous materials; install water heaters height to the human eye can easily observe the combustion heater is appropriate, about 1.5m high.

2, Stove
Embedded stove basis having the size or size hole in the box provided installation template open in the stove surface fitting hole, the bottom fitted kitchen stove should be set aside no less than 100cm2 air intakes to keep the stove bottom air free inflow;
Note the location of the stove so that more than 15cm away from walls or other items when opening, the top should be above 100cm space.

3, Range hood
Before installing construction, first determine the position of the machine installation, the pipeline route, and then ask the user to confirm the construction. Because of the installation location, the pipeline route does not meet the requirements or reasonable user requirements, the need to rework the material and labor costs, borne by the installer; To drill hole in the wall when the construction should ask the user wall are other pipes, such as wires, telephone lines and cable TV lines, the user confirmation before construction. Otherwise all the consequences arising therefrom by the installation unit conceited; when installing smoke smoke pipe, the first duct housing gasket placed in the machine at the outlet, with four screws to the duct seat fastened to the outlet, then put the smoke pipe exhaust openings lead to the wall outside.

4, Sterilizer
Disinfection cabinet with the cabinet composition, the site should be set up for communication with the sterilizer inlet and outlet to ensure good air intake and exhaust in cabinet in cabinet fitted place. Note: In the cabinet inconspicuous any part, you need to open a sterilizer and rear mounting holes communicating area of ​​not less than 50cm2 vents.
Embedded disinfection cabinet should be smooth installation in operation, easy maintenance and securely place (not tilted placement), keep a safe distance from the burner and high-temperature flame 15cm or more, away from water!

5, Electric water heaters
Attention: installers and users must strictly follow the state standard GB20429 "electric water heater installation specification" to install! Warning: Do users to install electric water heater! Please contact your local dealer or the installation company sales department arranged with electric water heater installation job qualifications for professional installation.
CAUTION: When the electric water heater installation must absolutely ensure reliable grounding! Do not meet the requirements of electric water heater installation, the installer should clearly inform the user, and explain the causes and recommend corrective recommendations by the user to professionals after the elimination of the threat, electric water heater installation can be carried out, that can not rectification, should refuse to install !
Warning: When installing to the one-way valve assembly accessory!

Electric water heater installation method:
1.Before installing the water heater installation should be checked whether the sturdy walls, the walls should be able to withstand the water heater filled with water after 4 times the total weight of the support force, the position of the mounting surface to ensure the right of the electric heater left 20 cm wide space, No embedded within the walls of the cable. Non-electric water heater will be installed on hollow walls.
2 expansion Lo subject can not be installed in the wall or caught in the cracks between the blocks.
3. The installation dimensions with the impact of drilling on a solid wall in the same horizontal drilling two holes having a diameter of 16 mm, hole depth 100 mm (Figure -7) »pitch as" b "," b "value and related parameters, please look in "Model comparison table".
4. Tighten the bolts inserted in the air, and the hook-up (Figure -8).



5. Place the rack above the alignment hole electric water heater expansion bolts hook firmly linked.
6. All Products fittings are G1 / 2 ". The installation
7. If you want more out of hot water (can refer to Figure -11) were shown to install pipe connections
NOTE: When installing a one-way valve, please be sure to recognize the one-way valve and the flow direction signs installed correctly, tighten the mounting nut and accessories, shall not leaking.
To handle lifted after installation, check the one-way valve is normal, and then reset.
NOTE: Select the location of the installation of electric water heaters, please try to avoid explosive gas leak-prone areas, to avoid serious smoke pollution and steam environment and try to shorten the distance between the water heater and water points.
Note: Kitchen Po water supply can not be multiplexed.